47 New Lots Avenue is the first of our three buildings that are part of the Brownsville Crossing project to begin construction. The foundations are in and the cellar and first floor framing are being installed. The steel moment frame is supporting a bearing wall on the upper floors and allows for an open commercial space at the first floor.
Structural steel installed at the cellar and first floor
Cellar walls and framing
Insulation is being placed on top of the waterproofing and will sit beneath the cellar slab to be poured later.